TechnipFMC awarded significant iEPCI contract by Woodside Energy for Xena Phase 3 Development

May 16, 2024

TechnipFMC  has been awarded a significant integrated Engineering, Procurement, Construction, and Installation  contract by Woodside Energy  in Australia.

TechnipFMC will design, manufacture, and install the subsea production system, flexible pipe, and umbilicals for the Xena Infill well (XNA03) to support ongoing production from the Pluto LNG Project. The award follows an integrated front end engineering design (iFEED™) study.

The project will use the Company’s Subsea 2.0® production system. Xena Phase 3 will be tied back to existing subsea infrastructure previously supplied by TechnipFMC.

Jonathan Landes, President, Subsea at TechnipFMC, commented: “We are proud to be delivering a fully integrated project from concept to execution. This project will help our long-term client meet their objectives, demonstrating the favorable impact iFEED™, iEPCI™, and Subsea 2.0® can have on project economics.”
The contract is the latest call-off on the framework agreement between Woodside Energy and TechnipFMC.

Related News.

Subscribe to our newsletter!

if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!

* indicates required
Consent *
By submitting this form you agree to receive Email Marketing

Design & Development by P.KAN.DESIGNER

Design & Development by P.KAN.DESIGNER

Privacy Preference Center