Nokia and SURF reach 800Gb/s transmission on existing fiber to prepare for massive upgrade to CERN’s Large Hadron Collider

- Trial conducted over 1648 km existing fiber link connecting research facilities at Nikhef, CERN, and SURF.
- A higher capacity network is needed to upgrade the CERN particle accelerator, which will enable better research and grow data sets by approximately a factor of five. This could fuel new discoveries in fundamental physics beyond 2029.
- Successful test demonstrates that SURF can increase the capacity of existing network infrastructure to handle some of the largest data exchanges in the world, and shows the interoperability and performance of Nokia’s PSE-6s super-coherent optics.
Nokia and SURF, the collaborative organisation for IT in Dutch education and research, have successfully reached a single carrier 800Gb/s optical transmission over SURF’s existing cross border, multi-vendor research and education network infrastructure. The transmission, based on Nokia’s photonic service engine technology, will help accelerate the massive data exchange between the CERN particle accelerator and the NL Tier-1 (NL T1) research IT facilities at SURF and Nikhef, the Dutch National Institute for Subatomic Physics. By reaching 800Gb/s per channel on older fiber varieties, Nokia and SURF prove that existing infrastructure still has tremendous potential, and that legacy optical fibers can be used to meet future capacity demands of the huge data streams generated by international scientific research instruments.
The trial was conducted over a 1648 km point-to-point fiber link connecting Amsterdam and Geneva, crossing Belgium and France. The fiber link is part of the SURF-network, which connects national research and education institutes in the Netherlands, such as Nikhef. Additionally, the SURF-network is also well connected to other research networks and experiments worldwide, including the LHC Optical Private Network (LHCOPN). The LHCOPN provides access to data at the Large Hadron Collider (LHC) at CERN, the world’s largest and most powerful particle accelerator. For this trial, CERN, Nikhef, SURF and the ATLAS LHC experiment have collaborated to include real production workflows that are expected when the High-Luminosity Large Hadron Collider (HL-LHC) is operational.
SURF is preparing its network for CERN’s LHC upgrade to the HL-LHC that will become operational in 2029. The discovery of the Higgs boson by the LHC has already revolutionized the world’s understanding of the universe. Expectations are that the future HL-LHC will reveal even deeper insights into the fundamental building blocks of the cosmos. This upgrade will not only provide more insightful research results and improve the potential for groundbreaking discoveries, but it will also produce enormous amounts of scientific data. The HL-LHC is expected to generate data at a rate of five times the speed of its predecessor. Therefore, it depends on advances in SURF’s high-performance network, as demonstrated in this trial, to enable fast and reliable data transfer to the NL T1 for further scientific exploration.
Nokia’s sixth-generation super-coherent Photonic Service Engine (PSE-6s) was deployed on the Amsterdam-Geneva link, in combination with SURF’s line system with equipment from a third-party on an older fiber link. It showed that the partners were able to achieve 800Gb/s transmission using 16QAM-shaped PCS modulation. Together, Nokia and SURF demonstrated the capacity and performance of their solutions, as well as the potential for SURF to increase the capacity and efficiency of its existing network. By focusing on the testing of new technologies with various suppliers, and through the adoption of advanced technology in its network, SURF ensures optimal service and support for the innovative, data-intensive projects of its research partners.
Ron Augustus, Chief Innovation Officer, member of the Board at SURF, said: “We are proud to collaborate with Nokia and Nikhef in this successful innovative trial that pushes the limits of our existing fiber and shows us what is possible. This trial is an important milestone for us as we prepare our network for the future demands of scientific research and education, including the upgrade of CERN’s particle accelerator. By emphasizing testing and the adoption of advanced technology, SURF ensures optimal service and support for its research partners’ innovative, data-heavy projects and applications.”
James Watt, Vice President and General Manager, Optical Networks at Nokia, said:“Groundbreaking test events like this show how networks can play an essential role in initiatives that help unlock the secrets of the universe, and the role they play enhances our ability to learn and grow as a civilization. This trial is a testament to the innovation, collaborative spirit and leadership of both Nokia and SURF in the optical networking space. We are committed to helping SURF prepare its network for the upgrade of CERN’s particle accelerator, and look forward to working with other research and education networks around the world to advance their missions and enable cutting-edge discoveries.”
Tristan Suerink, IT-Architect at Nikhef, said: “The 800Gbit/s technology demonstrated together with SURF and Nokia, shows us that getting the data from the HL-LHC at CERN to Amsterdam will be very feasible. Nikhef is working hard to design and build the detectors that will be part of the HL-LHC and therefore it’s crucial to be able to transfer the massive amounts of data that will be generated by the experiments. Working together with Nokia and SURF on this innovative trial, gave us a unique opportunity to get a glimpse of what’s possible in the near future. And the future looks bright and wonderful and we can’t wait for it!”
Related News.
October 26, 2026
Predicting the Future or Preparing for It? Cyprus Marine Club Explores the Power of Adaptability with Natasa Pilides
In a world where uncertainty has become the new normal, is predicting the future really the best strategy, or is the ability to adapt the greater…
October 26, 2026
Greece and Egypt in talks to extend EEZ Eastwards towards Cyprus following Libya’s move on Turkish Maritime Pact
Athens and Cairo have agreed to advance bilateral consultations aimed at extending the geographical scope of their 2020 Exclusive Economic Zone (EEZ)…
October 26, 2026
Seafarers face widening competency gap as digital shipping accelerates, recent research finds
Eighty two per cent of maritime professionals surveyed say current training does not adequately prepare crews for the realities of modern,…
October 26, 2026
Wärtsilä and WinGD sign new Service Framework Agreement to ensure long-term continuity and support for the global fleet
Technology groups Wärtsilä and WinGD have entered into a new long-term Service Framework Agreement, reaffirming their shared commitment to supporting…
October 26, 2026
Seatrium and Karpowership sign contract for a series of whale class Powership Conversion and Integration Projects
Seatrium and its strategic partner, floating power leader Karpowership, have strengthened their longstanding collaboration with the award of a…
October 26, 2026
ClassNK releases Handbook Supporting Consideration of Onboard Carbon Capture “Onboard Carbon Capture Systems Implementation Framework”
Bringing together technical, infrastructure, regulatory and emissions assessment considerations across the OCCS value chain - ClassNK has released a…
October 26, 2026
HHLA lowers earnings forecast for the 2026 financial year
Based on the business development to date and updated estimates for the fourth quarter of 2026, the Executive Board of Hamburger Hafen und…
October 26, 2026
Port of Los Angeles reports lowest emissions per Container on Record
The Port of Los Angeles continued to make clean air gains in 2025, recording its lowest emissions per container on record, according to the Port's…
October 26, 2026
Drewry World Container Index – 22 Oct
WCI increased for the second consecutive week, the highest in 15 weeks. See detailed commentary below. Drewry World Container Index…
October 26, 2026
Mammoet, Port of Argentia and Argentia Capital Partner to Advance Floating Dry Dock and Marine Repair Facility
Partnership builds on Mammoet’s established presence at Port of Argentia and shared confidence in the growing market for ship repair and marine…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























