Valenciaport awards the project for the installation of the electrical connection to ships at the Transversal de Costa quay

The Port Authority of València has awarded SAMPOL Ingeniería y Obras S.A.the contract for the drafting and subsequent execution of the OPS project at the Transversal de Costa quay in the Port of València
Valenciaport has awarded ‘the contract for the drafting and execution of the project for the installation of electrical connection to ships’ at the Transversal de Costa quay in the Port of València. The amount of the award is 11,102,423.59 euros and this contract includes the drafting of the construction project; the execution of the installation works for the electrical supply to ships together with the connection and disconnection operation; and the maintenance of the installations. A total period of 57 months is envisaged for all of this.
The Port Authority of València (PAV) has awarded this contract to the company SAMPOL Ingeniería y Obras S.A., which will develop a specific project, with technically complex solutions that will be designed specifically for this location. To this end, the company will consider the combination of the individual components required for this type of installation (transformers, protection cells, disconnectors, frequency converters, etc.) with infrastructures for supplying electricity to ships.
Project execution phases
Thus, on the one hand, a first phase of drafting the construction project of the installation is contemplated, for which a period of three months is established and a further three months for its review and approval by the APV, with an award value of 121,000 euros. On the other hand, a period of 15 months is envisaged for the execution of the works for an amount of 10,933,023.59 euros. And finally, the maintenance work on the installation will be carried out for 48,400 euros over a period of 36 months. The execution of the construction project is subsidised by the European Union’s Next Generation funds and the Spanish government’s Recovery, Transformation and Resilience Plan.
TheOnshore Power Supply (OPS) is a key tool in the framework of the decarbonisation strategy of the Port Authority of València, as the origin of this energy is renewable and will replace the consumption of fossil fuels. This system will avoid the use of the ships’ auxiliary engines when they are docked in port, thus reducing greenhouse gas emissions.
With access to the medium voltage connection (over 1,000 V) for ships already in place, the Port of Valencia will be able to require ships to use only electrical energy within the enclosure. This is a key factor for the decarbonisation of the enclosure’s activity.
Related News.
October 27, 2026
Beyond Compliance to Uninterrupted Operations: Delia Shipping’s Konstantinos Stais on Maritime Cyber Resilience, LEO Expansion, and AI Governance
As the global maritime industry navigates an era of intense digital acceleration, the traditional boundaries separating shipboard operational…
October 27, 2026
Chinese AI quietly writes hackable code for Beijing’s Adversaries, even when run locally, study finds
Qwen3-Coder wrote hackable apps 19% more often for US defense contractors and leaked data 28% more often for Hong Kong activists, AI security firm…
October 27, 2026
Industry leaders launch world’s first maritime-specific cyber vulnerabilities database
Cydome, ClassNK, Bureau Veritas, MTS-ISAC and Rakuten Maritime announce the “Blue Initiative”, an open collaboration to improve maritime cyber…
October 27, 2026
Businesses increasingly adopt AI for cybersecurity while individuals expand privacy protections
As cyber threats grow and digital technologies become more pervasive, businesses are increasingly using AI to strengthen…
October 27, 2026
EmissionLink calls for EU ETS revenues to fund maritime carbon capture trials and port infrastructure
Maritime emissions specialist, EmissionLink, has called for a dedicated proportion of EU Emissions Trading System (EU ETS) revenues to be invested…
October 27, 2026
Port of Antwerp-Bruges sees strong recovery in container throughput in volatile trading environment
In the first nine months of 2026, Port of Antwerp-Bruges handled 200.9 million tonnes of goods, 0.8% less than in the same period last year.…
October 27, 2026
Sanctions risks reshape commodity trading
Traders face sanctions challenge “odyssey” as geopolitical risks reformat global markets Commodity traders are operating in an increasingly…
October 27, 2026
Titan analysis shows FuelEU pooling propelled liquefied biomethane demand
- Clean fuel supplier evaluates compliance for 8,000 TEU containership operating in Northern Europe - FuelEU Maritime balances competitiveness…
October 27, 2026
Russian diesel tanker heads to New York as Kremlin claims regular shipments
Malta-flagged tanker should carry 40,000 mt fuel Agioi Fanendes left Primorsk Oct. 22: CAS US lifts sanctions, enables Russian imports……
October 27, 2026
Pilot transfer operation: A safer step aboard
Safe pilot transfer operations depend on both correct procedures and fit-for-purpose equipment. New SOLAS requirements entering into force in…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























