Equinor reduces emissions from Sleipner and Gudrun

The Sleipner field centre, along with the Gudrun platform and other associated fields, is now partly operating on power from shore. This will reduce annual emissions from the Norwegian continental shelf by 160,000 tonnes of CO2.
All installations on the Utsira High are now receiving power from shore, saving emissions amounting to about 1.2 million tonnes of CO₂ per year. The electrification of the installations on the Utsira High is in line with the plan for development and operation (PDO) for Johan Sverdrup phase 2, which was approved by the Norwegian parliament in 2019.

“Electrification is the most effective tool in our toolbox in our quest to achieve the national target of halving greenhouse gas emissions from Norwegian oil and gas production by 2030,” says Geir Tungesvik, executive vice president for Projects, Drilling & Procurement.
One of two operative gas turbines on the Sleipner A platform will gradually be shut down as a relevant systems transition to using power from shore. The other gas turbine will stand by as a back-up power source during a run-in phase. In the longer run, Sleipner will have the opportunity to fully operate on power from shore.
The Sleipner field centre has been supplied with onshore power via a cable from the Gina Krog platform since 24 March 2024. Starting on the same date, the Gudrun platform was connected to electricity through the existing cable to Sleipner.

“The Sleipner area has delivered vast volumes of energy, created long-term ripple effects and contributed substantial values to the Norwegian society. With power from shore, we can develop new discoveries and resources from low-emission production, and gas export from the area can be maintained for a long time to come,” says Kjetil Hove, executive vice president for Exploration & Production Norway.
The Sleipner fields are among the largest gas producers in the North Sea and serve as a hub for gas transport to Europe. Norwegian gas plays an important role in the EU’s energy transition. Now, also the gas that would otherwise be burnt on the installations can be utilised more effectively in Europe.
“The electrification of the Sleipner field centre has created important jobs and ripple effects for the Norwegian supply industry. I’m also very pleased with that we, our partners, and suppliers, have succeeded in implementing the project safely, with zero HSE incidents,” Tungesvik says.
Overall investments in the project total NOK 1.08 billion.
In 2020, the Sleipner partnership exercised an option with Aibel for an EPCIC contract (engineering, procurement, construction, installation and commissioning) for the modification work on the Sleipner field centre. NKT was awarded the contract to manufacture and lay the power cables.
The EPCIC contract has a value of about NOK 700 million and has contributed to 250 full-time equivalents at Aibel’s Stavanger office, offshore and at the shipyard in Haugesund. ABB has carried out substantial work as a sub-contractor within installation of high-voltage equipment and updating the power control system.

Related News.
November 25, 2026
Crewing After 2026: How AI Will Take Over the Routine in 2027
The crewing market of late 2026 is not the market of 2025. Artificial intelligence has moved from presentations into daily crewing work, while the…
November 25, 2026
Dualog launches secure maritime AI service amid surge in seafarer AI use
The new service, Sparks lets crew and shore teams search company emails, documents and conversations without exposing sensitive fleet information to…
November 25, 2026
Time Ticking: Two weeks for Governments to Green-Light Framework for Cutting Shipping Emissions
As a crucial fortnight of meetings opens at the International Maritime Organization opens in London, the Clean Shipping Coalition calls on member…
November 25, 2026
“K” LINE signs contract for construction of two LPG dual-fuel VLGCs
Kawasaki Kisen Kaisha, announces today that it has signed agreements with South Korea-based HD Hyundai Samho regarding the construction of two LPG…
November 25, 2026
Equinor and VNG sign 18-year gas sales agreement for supplies to Germany
Equinor will supply natural gas to the German energy company VNG until the end of 2044. The 18-year agreement is the longest gas sales agreement…
November 25, 2026
Open letter to MEPs to reject the motion for a resolution and support the inclusion of Indian ship recycling yards on the European List
Dear Members of the European Parliament, Ahead of this week’s plenary vote, European Shipowners | ECSA, BIMCO, the Cruise Lines International…
November 25, 2026
ShipVet appoints James Stairmand as Chief Executive Officer
Founder Captain Fintan Cullen moves to a non-executive role as the company builds on investment in its vetting team and technology. ShipVet, the…
November 25, 2026
USD ≈7bn lost per year the hidden cost of how shipping trades
New Torvald Klaveness study quantifies around USD 7bn a year in potentially avoidable costs in dry bulk and product tanker shipping, with a possible…
November 25, 2026
APM Terminals Maasvlakte II and Port of Rotterdam Authority take next step in terminal development
APM Terminals Maasvlakte II and the Port of Rotterdam Authority are moving forward in terminal’s development with preparations for a new phase of…
November 25, 2026
ABP inspiring the next generation
ABP host 500 young people to explore maritime and transport careers More than 500 young people from across Hampshire and the Solent explored career…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























