Hamburg Senate recommends new replacement for Köhlbrand Bridge

April 4, 2024

During session, the Senate reviewed the options for the Köhlbrand crossing and decided in favour of a new bridge. The rationale behind this choice is outlined in a printed document, which will now be presented to the Hamburg Parliament for consideration.

The existing Köhlbrand Bridge has reached the end of its operational lifespan and requires replacement. Following an examination and evaluation of various crossing options, the Senate has opted for the construction of a new bridge.

The replacement construction will achieve a higher clearance for ships. In the future, ships of current height and potentially slightly larger sizes will be able to access the southern part of the port. This removes a previously limiting factor and opens up new possibilities for port development.

The new replacement bridge is scheduled to be opened for traffic from 2040 onwards and will replace the exisiting Köhlbrand Bridge. Until then, the current bridge will continue to be utilized and maintained. Subsequent tasks will include additional work, such as the dismantling of the existing structure.

A comprehensive description and comparison of the investigated crossing alternatives, decision criteria, and details on costs and potential timelines can be found in document 22/14809, which will soon be available (in German) in the Parliament database.

Related News.

Subscribe to our newsletter!

if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!

* indicates required
Consent *
By submitting this form you agree to receive Email Marketing

Design & Development by P.KAN.DESIGNER

Design & Development by P.KAN.DESIGNER

Privacy Preference Center