Valencia Port starts work on the new passenger terminal project

In the next few days, the project for the refurbishment of the site of the old shipyard of the Port of València will be published with a tender budget of around 900,000 euros.
It will also contemplate the recovery of reusable materials to be sold for an estimated value of more than 400,000 euros.
The new public passenger terminal will be a model infrastructure in terms of the environment, sustainability, accessibility and intelligence, at the service of the city.
According to the PAV project, which included contributions from the València city council, the passenger station will operate with zero polluting emissions and will be committed to the circular economy.
The new public passenger terminal begins to take its first steps with the start of the awarding procedure for the works for the “refurbishment of the site of the old shipyard of the Port of Valencia” that the Port Authority of Valencia (APV) will publish in the next few days with a tender budget of around 900,000 euros. This project includes the demolition of some of the warehouses and other buildings on the site and the ramp of the north slipway, as well as the dismantling of all the equipment and installations, and the prefabrication installations for the steel blocks. This procedure also includes the disposal of reusable materials, such as tiles or metal parts, for sale with an estimated value of more than 400,000 euros.
The project for the new passenger terminal, which will be located between the Muelle de Poniente and the Muelle Perfecto Palacio in the area previously occupied by the Unión Naval de Valencia shipyard, will occupy an area of approximately 100,000 square metres. The design of this infrastructure will maintain the four elements of the old shipyard catalogued by the Demetrio Ribes Chair of Industrial Archaeology of the University of Valencia as pieces of historical and artistic value. Specifically, these are the water tank, the shipbuilding slipway, two cranes and sub-ship A of building III. It will be a historic and emblematic building of maritime València that will continue to serve the city and the citizens – more than a hundred years after its construction – now with the most modern environmental technologies.
As stated in the refurbishment project, the demolition of building 2 (Tilling workshop) of 6,326 m2, building 4 (Prefabrication workshop) of 2,591 m2, and two smaller buildings for industrial, administrative and sanitary use of 129 m2 and 293 m2, respectively, will be carried out. The procedure also envisages the dismantling of the steel block prefabrication facilities. The project also envisages the disposal of reusable goods from the steel block manufacturing area, metal materials present in the rest of the building and the tiles forming the roof.

This action is not affected by the concession for the execution of a new building to Corporación Marítima Boluda, which has the partial suspension by the Secretary of State for Transport, Mobility and Urban Agenda of the 2nd agreement of the PAV Board of Directors of 20 December 2018. This resolution of the Secretary of State of 3 August 2021 concerns the provision to Boluda Corporación Marítima of the land necessary for the execution of the new building and the car parks, which have not yet been started, maintaining its effects on the use of the existing building, under the terms established in the approved concession specifications, which allows the execution of the works and actions of the PAV to continue.
Sustainable terminal at the service of the city
The new passenger terminal is intended to serve cruise traffic, regular lines with the Balearic Islands and Algeria, as well as ro-ro traffic (platforms or vehicles that access the ships by their own means). This infrastructure, which has the bid submitted by the shipping company Baleària, guarantees that 100% of the electrical energy necessary for the operation of the terminal will be produced in the facilities themselves, and will be of renewable origin. According to the project presented to the PAV tender, which included the contributions of the València City Council in environmental matters, the passenger station will operate with zero polluting emissions and will be committed to the circular economy. In this sense, all berths will be equipped with an electrical supply network for docked ships, thus making it easier to stop the engines and their emissions when they are visiting València; and all the roofs and ceilings of the existing buildings will be designed for the installation of photovoltaic solar panels.
The terminal will recycle 100% of the waste it generates in a biomethane plant that will be built expressly for this purpose; and it will treat waste from the ships and the building itself to obtain biogas. The interior design of the station will guarantee the independent operation of cruise passengers and passengers on regular lines. Other new features of the project include the planned development of an Innovation and Eco-efficiency Centre and a space for cultural activities. The project presented by the shipping company also contemplates a training centre of the Baleària Business School (EdEB) with an offer in different areas of the maritime sector and especially aimed at the Nazareth neighbourhood, within an action plan to involve the main actors and interest groups.
Related News.
November 25, 2026
Crewing After 2026: How AI Will Take Over the Routine in 2027
The crewing market of late 2026 is not the market of 2025. Artificial intelligence has moved from presentations into daily crewing work, while the…
November 25, 2026
Dualog launches secure maritime AI service amid surge in seafarer AI use
The new service, Sparks lets crew and shore teams search company emails, documents and conversations without exposing sensitive fleet information to…
November 25, 2026
Time Ticking: Two weeks for Governments to Green-Light Framework for Cutting Shipping Emissions
As a crucial fortnight of meetings opens at the International Maritime Organization opens in London, the Clean Shipping Coalition calls on member…
November 25, 2026
“K” LINE signs contract for construction of two LPG dual-fuel VLGCs
Kawasaki Kisen Kaisha, announces today that it has signed agreements with South Korea-based HD Hyundai Samho regarding the construction of two LPG…
November 25, 2026
Equinor and VNG sign 18-year gas sales agreement for supplies to Germany
Equinor will supply natural gas to the German energy company VNG until the end of 2044. The 18-year agreement is the longest gas sales agreement…
November 25, 2026
Open letter to MEPs to reject the motion for a resolution and support the inclusion of Indian ship recycling yards on the European List
Dear Members of the European Parliament, Ahead of this week’s plenary vote, European Shipowners | ECSA, BIMCO, the Cruise Lines International…
November 25, 2026
ShipVet appoints James Stairmand as Chief Executive Officer
Founder Captain Fintan Cullen moves to a non-executive role as the company builds on investment in its vetting team and technology. ShipVet, the…
November 25, 2026
USD ≈7bn lost per year the hidden cost of how shipping trades
New Torvald Klaveness study quantifies around USD 7bn a year in potentially avoidable costs in dry bulk and product tanker shipping, with a possible…
November 25, 2026
APM Terminals Maasvlakte II and Port of Rotterdam Authority take next step in terminal development
APM Terminals Maasvlakte II and the Port of Rotterdam Authority are moving forward in terminal’s development with preparations for a new phase of…
November 25, 2026
ABP inspiring the next generation
ABP host 500 young people to explore maritime and transport careers More than 500 young people from across Hampshire and the Solent explored career…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























