CNOOC announced Jinzhou 31-1 Gas Field Development Project commenced production

November 21, 2022

CNOOC announced that Jinzhou 31-1 gas field development project commenced production.

Jinzhou 31-1 gas field locates in Liaodong Bay of Bohai Sea, with an average water depth of about 30 meters. The main production facilities include 1 subsea production system, 1 submarine transportation pipeline, and 1 umbilical cable. It will fully utilize the existing processing facilities of Jinzhou 25-1 south platform and apply the first shallow-water Christmas tree independently developed in China. The project is expected to reach its peak production of approximately 14.8 million cubic feet of natural gas per day in 2023.

CNOOC Limited holds 100% interest in Jinzhou 31-1 gas field development project and acts as the operator.

Related News.

Subscribe to our newsletter!

if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!

* indicates required
Consent *
By submitting this form you agree to receive Email Marketing

Design & Development by P.KAN.DESIGNER

Design & Development by P.KAN.DESIGNER

Privacy Preference Center