Equinor issues complementary assessment for Wisting

Equinor will on 24 October, on behalf of the partners, issue a complementary assessment for the Wisting development for public consultation.
The complementary assessment provides more details on how the field can be developed and operated in a safe and secure manner.
“The complementary assessment elaborates some key subjects from the impact assessment, strengthening the decision-making basis for a safe and secure field development,” says Trond Bokn, Equinor’s senior vice president for project management control.

“The impact assessment, public consultation processes, and the complementary assessment have so far not brought to light any information which changes our view that developing Wisting is technically and environmentally appropriate.The work on technical studies and detailing of plans for the development of the project will continue towards the planned investment decision at the end of 2022,” Bokn adds.
The plan for development and operation (PDO) to be submitted to the Ministry of Petroleum and Energy includes the full decision-making basis for Wisting, including public consultation statements and feedback.
The government will then present its recommendation to the Norwegian Parliament (Storting), including an evaluation as to whether the obligation to conduct an impact assessment has been met, and whether field development is recommended.
Due to the Wisting field’s geographical location in the Barents Sea solid solutions for safe year-round operations are required. The management plan for the Barents Sea, adopted in 2020, forms the framework for the field development, and the Wisting development concept is well adapted to the conditions in the Barents Sea. As fields producing for up to 30 years call for good long-term climate solutions, the field is proposed to be powered from shore.
The complementary assessment provides additional details on the potential impacts of the development for four subjects: Year-round activities, environmental risks, oil spill contingency, and the use of the best available techniques for field development and operations.
Regulations and technology have developed as the petroleum activities have expanded into new areas. Safe year-round operations are a precondition for all activities on the Norwegian continental shelf, and all relevant requirements ensuring this will also apply to Wisting.
Equinor will adapt the installation and safety of the operations to low-temperature conditions, so-called winterization. The installation will withstand ice conditions that statistically may occur once every 10,000 years. Ice monitoring systems will be established, allowing operations to be adjusted if the ice gets closer than 50 kilometres from the installation.
The Wisting project implements several measures initially aimed to prevent, but also minimize the consequences of undesired incidents. The Wisting development involves drilling of a number of wells and this number make it possible to plan drilling activities throughout the year in a good way.
In light of this, Equinor will schedule activity for a time of the year that minimizes environmental risk and will therefore not drill in oil-bearing layers during the most vulnerable month for seabirds. The measure in the drilling phase may be replaced by alternative measures that provide equivalent protection for seabirds, if these are considered the best available techniques (BAT).
The oil spill contingency will be adapted to the specific environmental conditions of the area. Conditions to be addressed in the contingency planning are the adaptation of equipment and methodology, the number of available oil spill contingency systems, training and exercises, the strategy for dealing with oil spills, and increased preparedness in periods when the damage potential is highest in the event of a spill.
Equinor will give feedback on each individual statement on the impact assessment and the complementary assessment no later than at the submission of the PDO. The deadline for statements on the complementary assessment is within two weeks, in compliance with the PDO guidelines.
The Wisting partners: Equinor Energy AS (35 %), AkerBP AS (35 %), Petoro AS (20 %) and INPEX Idemitsu Norge AS (10 %)
Related News.
October 19, 2026
OL Shipping Group in Tokyo: Capt. Eberhard Koch calls for realistic solutions to Maritime Decarbonisation
An intensive and engaging couple of days in Tokyo brought together leading figures from the international maritime community, providing a valuable…
October 19, 2026
Regatta for Peace one of the largest ever in Cyprus
Cyprus will host the first European stop on a global sailing journey leading up to the 2027 America’s Cup in Naples. More than 120 sailors…
October 19, 2026
The propulsion technology powering the marine energy transition
The marine industry is under increasing pressure to future-proof fleets, balancing the need to reduce emissions and improve efficiency. Propulsion…
October 19, 2026
Signal Ocean acquires Lgmar
Signal Ocean announced the acquisition of Lgmar, the Athens-based company behind Telix, a maritime email and communication platform in daily use…
October 19, 2026
Canada clean power push challenged by interprovincial grid limits, says GlobalData
Canada is entering a pivotal phase of power-sector expansion as federal tax credits, the phase-out of coal-fired generation, and accelerating…
October 19, 2026
Maritime safety depends on human factors and leadership, not procedures alone
Interim survey findings point to a gap between seafarers’ perceptions of risk and injury data Seafarers may misjudge when and where they are most at…
October 19, 2026
New BIMCO contracts tackle ship recycling and energy-saving retrofits
BIMCO adopted two new contractual solutions designed to help you manage important operational and regulatory challenges: the revised…
October 19, 2026
Stena Line to acquire vessel and make changes to its network
Stena Line has reached an agreement to acquire the RoRo vessel Somerset from CLdN. Subject to closure and transfer, the vessel would begin operating…
October 19, 2026
DORIC WEEKLY INSIGHT 16 OCTOBER 2026
Please find below the DORIC Market Insight for the week ending 16th October 2026. Weekly Report 16.10.2026
October 19, 2026
Important information for port clients and freight carriers effective November 1, a new traffic overpass and port checkpoint will open for traffic to the Port of Riga on Kundziņsala
Starting November 1 of this year, a new traffic overpass connecting Tvaika Street to Kundziņsala will open to facilitate traffic to and from the Port…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























