Topsoe to build world’s largest electrolyzer production facility to accelerate Power-to-X capacity

- Topsoe will build the world’s most advanced industrial scale electrolyzer production plant to meet society’s need for Power-to-X solutions.
- Topsoe’s ambition is to speed up the green energy transition with solutions that decarbonize hard to abate industries.
- The plant will be built in Herning, Denmark. Construction work will start in second half of 2022 with expected start of operations in 2024.
- When in operation, it will be world’s largest electrolyzer plant with 500 megawatt capacity per year and with an option to expand to 5 gigawatt.

Topsoe, the global leader in decarbonization technologies, announced its intention to construct world’s largest and most advanced industrial scale electrolyzer production plant. Topsoe’s ambition is to rapidly accelerate the adoption of green solutions in particular within Power-to-X. In this field, the company has the leading technology to decarbonize hard-to-abate sectors such as transport, chemicals, steel, and cement.
The new electrolyzer production plant, which will be constructed in Herning, Denmark, will be operational by 2024 and have an annual capacity of 500 MW with scalability up to 5 GW, making it one of the first industrial scale plants of its kind. Construction is scheduled to begin in the second half of this year, subject to Board and other regulatory approvals.
Roeland Baan, CEO at Topsoe, says:
”We are willing and able to support society’s green ambitions and the need to accelerate the energy transition, and we have the technology to do it. With our new electrolyzer production plant, we lead the way in speeding up commercial-size Power-to-X solutions, and we do it with our highly innovative technology that outmatches technologies currently in the market.”
Topsoe is already seeing considerable interest in our Power-to-X solutions and is in advanced discussion with a number of potential partners over future offtake agreements and commitments to reserve capacity from the electrolyzer plant.
Developing a strong Power-to-X industry in Europe will also enforce EU’s ambitions of being independent of energy imports from other regions. The milestone in ensuring large-scale availability of electrolyzers for Power-to-X solutions takes place at the same time as Ursula von der Leyen, President of the European Commission, and state leaders from Denmark, Germany, The Netherlands, and Belgium signed an agreement, in which the parties agree to invest in a ten-fold capacity increase of offshore wind by 2050. The political agreement ensures significant availability of the renewable power needed to supply future Power-to-X facilities in the EU.
Roeland Baan says:
“The agreement between the EU Commission and the four North Sea countries is an important step in the transition to renewable energy. At Topsoe, we are also ready to invest. Our mission as a company is to reduce society’s emissions in 2022 by 12 million tonnes of CO2. By introducing solutions to decarbonize transportation and other hard to abate-sectors, we secure significant CO2 emissions not only in 2022 but for years to come, while also moving closer to energy independence.”
Dorte West, Mayor of Herning Municipality, says:
“There has been a great interest – also internationally – to attract Topsoe’s coming manufacturing plant. The fact that a renowned company like Topsoe chooses Herning makes me happy and proud, and it tells me, that our entrepreneurial spirit and drive is broadly recognized. Sustainability is highly prioritized by the City Council and fits perfectly together with Topsoe’s Power-to-X plans that points to the future. And surely, it’s a great in terms of new jobs in the municipality of Herning.

About the production plant
- Topsoe and Herning Municipality has signed a land lease agreement.
- Capacity: The plant will have a capacity of 500 megawatt electrolyzers per year and with an option to expand to 5 gigawatt.
- The plant will produce SOEC electrolyzers – Solid Oxide Electrolyzer Cells – which have a higher energy efficiency that competing technologies.
- Size: The leased land covers an area of 72,000 m2. The production plant will cover an area of more than 200×100 meters – or 23,000 m2.
- Jobs: When fully operational, 170 people will work on the site.
Related News.
September 25, 2026
ISLAND OIL: Unveiling of the Sculpture “Cyprus’s Journey Through the Ages” in Protaras – A Tribute and Landmark to Cyprus’s Historical Memory and Cultural Heritage
In a modest ceremony marked by a moving atmosphere, the sculpture “Cyprus’s Journey Through the Ages”, created by acclaimed Cypriot sculptor…
September 25, 2026
World Maritime Day 2026 from Policy to Practice – powering Maritime Excellence
Global regulations will deliver safer, more resilient shipping when they are implemented worldwide. The international maritime community marks…
September 25, 2026
Diana Shipping announces Time Charter Contract for m/v DSI Polaris with Dai An Ocean Shipping
Diana Shipping , a global shipping company specializing in the ownership and bareboat charter-in of dry bulk vessels, announced that, through a…
September 25, 2026
Chief Economists Expect Global Economy to Stabilize, but Fiscal Constraints, Rising Living Costs and AI Investment Uncertainty Threaten Growth
The global economy is stabilizing, but the fiscal support that cushioned successive shocks since 2020 is unlikely to play the same role in the year…
September 25, 2026
V. welcomes its new graduate cohort as programme expands across the group
Twelve graduates from nine nationalities join 11th year of V.’s expanded international management programme. V., the global ship manager and marine…
September 25, 2026
From Policy to Practice: Why Seafarers Are the Key to Maritime Excellence
The shipping industry is no stranger to regulation. Seafarers and ship operators work within a vast framework of international conventions, national…
September 25, 2026
Intermodal Report – Week 38 2026
Please find below the Intermodal market report for week 38 2026. Intermodal Report Week 38 2026 Market Insight By Nikos Tagoulis, Head of…
September 25, 2026
Allied – Weekly Market Review – Week 38
Please find below the Allied Weekly Report for Week 38 | 2026 ALLIED - Weekly Market Report- Week 38
September 25, 2026
Record year on the Northeast Passage but Arctic shipping remains very limited
In 2025, a record 103 transit voyages were made via the Northeast Passage. However, this is still equivalent to only around a day and a half of…
September 25, 2026
[xclusiv] S&P Report 21th September 2026
Please find below the [xclusiv] latest Weekly S&P Report [xclusiv] 2026_09_21 Market Commentary: VLCCs: Freight Boom Reprices the Fleet The VLCC…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























