GTT announces that it has received an order from its partner the Korean shipyard Daewoo Shipbuilding & Marine Engineering for the tank design of two new LNGCs[1].
As part of this order, GTT will design the tanks of the vessels, which will each offer a capacity of
174,000 m3. The LNGC tanks will be fitted with the GTT NO96 GW membrane containment system.
Deliveries of the vessels are scheduled during first half 2025.