ABS AIP for Bassoe Technology’s T-Floater Wind Turbine Foundation Design

ABS has granted Approval in Principle (AIP) to Bassoe Technology for its T-Floater floating wind turbine foundation design. The foundation is designed to carry a 10 MW turbine in the harsh conditions of the North Sea.
With three columns and T-shaped pontoons to allow transport of multiple T-Floater hulls on a dry tow vessel or alternatively in modules for in-water assembly, the design is intended to operate with a tow-out draft of only eight meters with the turbine installed. This facilitates flexibility in assembly port selection allowing quayside installation of the tower and turbine close to the wind farm.
“ABS has supported on delivering more than 80MW of pioneering floating wind turbine projects to the market. It is great to be able to use this experience to support new innovation in the market, such as this novel design from Bassoe Technology. We are committed to supporting the offshore wind supply chain through project designs that support new approaches to improving deployment processes and managing risks such as the T-Floater. From design to construction to operations, our international team strength adds value to projects,” said Greg Lennon, ABS Vice President, Global Offshore Wind.
“The T-Floater has been designed to meet the demand for industrialization and effective logistic solutions for floating wind. The ability to transport up to six completed 15 MW T-Floaters on a single dry tow vessel will allow for cost-efficient construction and transportation. Together with our parent company, CIMC Raffles, we will have the ability to deliver more than 50 T-Floaters per year but we will also, due to the in-water assembly possibility, be able to work together with local shipyards with limited width of dry-docks/slip-ways to meet local content requirements. Having experience designing oil & gas semi-submersibles to ABS approval, we appreciated the opportunity to expand our cooperation with ABS into floating wind,” said Joakim Nilsson, Managing Director, Bassoe Technology.
The AIP verifies that the design is feasible for the intended application and, in principle, complies with the applicable requirements of the ABS Guide for Building and Classing Floating Offshore Wind Turbine Installations. When constructed, the units will qualify for the ABS Class notations ✠A1, Offshore Wind Turbine (Floating), (S), Central North Sea, and FL(25).
ABS has classed the world’s largest floating offshore wind farm, Kincardine. The 50MW project, approximately 15km off the southeast coast of Aberdeenshire, at water depths ranging between 60m to 80m, is expected to generate up to 218GWh of clean electricity a year, which will be enough to power approximately 55,000 Scottish households.
As part of its commitment to the industry, ABS has produced two highly detailed reports into the offshore wind sector this year. Download copies of the reports, as well as a range of other industry-leading support and guidance from ABS here.
A copy of the ABS Guide for Building and Classing Floating Offshore Wind Turbines can be downloaded here.
Images courtesy of Bassoe Technology.
Related News.
November 9, 2026
Global study finds Cyprus ranks SEVENTH and set for $1.1 billion AI GDP boost
Cyprus beats India and New Zealand to come SEVENTH in major AI study – with potential €1.1 billion GDP boost and youth jobs opportunity Some 86% of…
November 9, 2026
Global shipping’s trillion dollar climate bill according to Zero Carbon Analytics
A new study by Zero Carbon Analytics finds that emissions from international shipping cost the global economy around USD 963 billion between 1990…
November 9, 2026
Keeping Children Safe Online at Sea Seafy® earns friendly WiFi Certification across 26 vessels
Seafy becomes Friendly WiFi’s first partner in the maritime sector, helping protect kids from harmful content online. Friendly WiFi is delighted…
November 9, 2026
MarinePALS keeps seafarers’ mental wellbeing results private from employers
MarinePALS has launched ‘MyMood’, a mental wellbeing self-check that enables seafarers to consider whether they need support without their individual…
November 9, 2026
ShipManager joins Star Information Systems to accelerate the maritime industry’s transition to cloud
CFARER, a DNV Company selects Star Information Systems as the longterm home for ShipManager and its cloud future Star Information Systems (Star)…
November 9, 2026
Seafarer experience must shape maritime technology, initial STEER Project report finds
New research finds technology can shift rather than remove risk as The Nautical Institute, with support from Lloyd’s Register Foundation, calls for…
November 9, 2026
New LR service targets cargo disruption when trade routes fail
New LR Advisory service helps ports, governments and logistics operators respond to disruption, protect critical cargo flows and strengthen trade…
November 9, 2026
DORIC WEEKLY INSIGHT 06 NOVEMBER 2026
Please find below the DORIC Market Insight for the week ending 06th November 2026. Weekly Report 06.11.2026
November 9, 2026
BIMCO Shipping Number of the Week
Coal shipments to India drop 7%, but limited recovery may lie ahead "Between January and October, coal shipments to India dropped 7% y/y due to the…
November 9, 2026
Hapag-Lloyd marks 20 years in South Africa and targets further growth
South Africa has become a cornerstone of Hapag-Lloyd's business in Africa Hapag-Lloyd surpasses 1 million TEU in Africa for the first time in its…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved






















