KCC and Becker-Marine systems Sign Fleet-wide contract for rollout of Energy Efficiency Solution

December 13, 2021
Image: MV Baffin (CABU), KCC’s second vessel to onboard the solution
KCC and Becker-Marine Systems have finalized an agreement for a fleet wide rollout of the Becker-Mewis Duct. The tailored hull appendix is designed to improve the hydrodynamics of the flow into the ship’s propeller, thereby increasing propulsion efficiency and reducing fuel consumption at sea.

Initial findings from model tank studies, CFD calculations, and operational feedback from pilot vessel MV Banastar have provided confidence the system will firmly contribute to KCC’s targets of further reducing CO2 emissions and fuel cost savings.

MV Baffin (CABUII) is KCC’s second vessel to onboard the device, during her ongoing dry dock. For 2022, a further four KCC vessels will benefit from the upgrade during planned dry-docking. KCC’s expectations are that the system will improve the fuel efficiency by an average of 5% – and give emissions savings of approximately 800MT CO2 per ship, per year.


Pictured: Ongoing installation of Becker-Mewis Duct aboard MV Baffin, currently undergoing 5-year Class renewal dry dock

Pictured: A model tank test of the CLEANBU hull
(Image courtesy: Bulgarian Ship Hydrodynamics Institute at Varna)

Related News.

Subscribe to our newsletter!

if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!

* indicates required
Consent *
By submitting this form you agree to receive Email Marketing

Design & Development by P.KAN.DESIGNER

Design & Development by P.KAN.DESIGNER

Privacy Preference Center