Valenciaport tenders the drafting of the urban development project for areas 2 and 5 of the Special Plan for zone 1 south of the Port of València

The Special Plan for the South Zone 1 of the Port of Valencia or Nazaret East Plan continues to take firm steps to convert this area of the city of Valencia, and especially the Nazaret district, into new green, tertiary and sports spaces. A new green lung and a multifunctional area that will reinforce the social and urban fabric of this neighbourhood, and will act as a catalyst for the economy. The Port Authority of Valencia (PAV) has published the specifications for the contracting of the drafting service for the urban development project for development areas 2 and 5 of this Special Plan for the southern zone 1 of the Port of València, with a base tender budget of 220,000 euros and a completion period of six months for the successful bidder.
Specifically, area 2 has a surface area of 18,454.04 m2 dedicated to tertiary use and is in the former ARLESA facilities (later MOYRESA, and in its last stage also known as BUNGE). The whole of the tertiary and multi-purpose sector is integrated into the urban fabric of Nazareth and falls within the Turia Garden Mouth Park. Area 2 has five plots, one of them of 11.646,84 m2, destined to garden and the rest for tertiary/dotacional use. In this area there is a protected area of ficus trees and a monumental eucalyptus tree. This area will have a buildable area of 25,000 m2t provided for in the agreement between the València City Council and the PAV, distributed in four blocks of 2, 3 and 5 storeys, grouped two by two in an L-shape following the outline of the urban fabric and allowing the continuity of the views and the integration of the existing neighbourhood with the park.
Area 5 is a green area located on the southern edge of the Plan area with an area of 8,375.86 m2. The development proposes two independent green areas separated by a road that runs parallel to the southern exterior front of the covered sports facilities from Calle de Algemesí to give access to a new parking area.

An area equivalent to 40 football stadium
The Special Plan for South Zone 1 of the Port of València, which is part of the Port of Valencia’s Port Space Delimitation Document (DEUP), transfers and defines in detail the details of the specific agreement reached between the City Council of Valencia and the PAV, which was approved in February 2017. This initiative is the result of the city-port relationship strategy, in which, in addition to the PAV and the City Council, the port community and the city’s residents also participate.
With the Nazaret East Plan, the PAV is earmarking 230,000 square metres of port territory, adjacent to the Natzaret neighbourhood, for public use. An area equivalent to 40 football pitches, which will provide the area with new green spaces such as the Mouth River Park, tertiary and sports facilities, with the Levante UD sports city. The Plan is divided into 5 areas:
Area 1, River Mouth Turia Park: 86.296,08 m2.
Configured downstream of the Astilleros Bridge, it includes the new structural development park and the old Turia riverbed, now channelled, with a total area of 86,296.08 m2.
Area 2, Tertiary Use: 18.454,04 m2
Located approximately on the site of the old ARLESA installations, it is intended for tertiary use and, where appropriate, also for public use, with an area of 18,454.04 m2.
Area 3, Sports facilities: 98.940,17 m2
Sports and open space area with an extension of 98.940,17 m2. This sports facility partially occupies the existing green area to the south (Natzaret South Park) and represents the recovery of the site of a sports facility, a green border between the port activity and the Natzaret neighbourhood, and also a centre for the promotion of uses and activities linked to leisure and sport.
The planning arranges this area, a priori, in two different urban plots in order to facilitate its management and subsequent execution:
A first plot that occupies practically the entire area, with a land area of 94,999.66 m2 whose main purpose will be to house outdoor sports facilities. It foresees the possibility of locating buildings linked to the main use, as well as other auxiliary support constructions. On the ZV-DP plot is located the building protected by the general planning, the “Benimar” building, which is included in the Inventory of buildings and elements of architectural interest of the municipality of Valencia. The sports facilities planned to be included in this area will have to carry out the refurbishment work on the Benimar building.
The second plot has a surface area of 3,940 m2 to locate an indoor sports facility.
Area 4, Marblau Equipment: 2,246 m2
The plan incorporates the existing facilities located in Algemesí Street, currently in operation, managed by the Valencia City Council through a concession for use as a youth centre, popular university and museum of the vegetable garden in the old Marblau spa. The surface area allocated to this area is 2,246 m2.
Area 5, Natzaret South Park: 8.375,86 m2
Area located on the southern edge, with an extension of 8,375.86 m2.
Green corridor
The Plan also includes a green cycling and pedestrian corridor linking the River Mouth Park with the current corridor which, running through the Logistics Activities Zone, connects with the areas of La Punta and Pinedo, with the aim of improving the continuity and dimensions of the green corridor around Nazaret to the northeast, linking all the maritime settlements from La Malvarrosa to La Punta and Pinedo. This cycle lane will have a minimum width of 2.50 metres, separated from the road and the pedestrian area.
Related News.
November 24, 2026
Greece has the most to lose from delays in shipping’s green transition, new analysis finds
UCL and WWF Greece report finds the IMO Net-Zero Framework offers Greek ship owners the clarity they need, and the best protection against a…
November 24, 2026
Snow Land joins Cool Carriers as the world’s first reefer with a gate rudder, a new chapter for sustainable and efficient reefer shipping
Cool Carriers, the world’s largest operator of specialised reefer vessels, took delivery of Snow Land from Kitanihon Shipbuilding in Japan on 12…
November 24, 2026
IBIA launches Marine Energy Outlook Survey as Annual Convention in New York
IBIA - The International Bunker Industry Association officially launched its Marine Energy Outlook Survey during the IBIA Annual Convention in New…
November 24, 2026
Why did ITF staff vote to strike again?
Staff at the International Transport Workers’ Federation (ITF) headquarters in London have voted to give their union a strike mandate. According to…
November 24, 2026
Nearly half of maritime crew tickets booked a week ahead are cancelled
Two new C Teleport reports show when maritime and aircrew teams book crew flights, how often they cancel, and what late booking costs, with a…
November 24, 2026
Kpler completes $1.5bn+ Sixth Street investment and continues accelerating growth
Investment backs Kpler's bold ambition to shape the future of global trade intelligence. Kpler, a leading provider of global physical trade…
November 24, 2026
How SAL and DNV are strengthening heavy-lift shipping
From classification and newbuilding support to operational tools and advisory expertise, SAL and DNV have been collaborating for decades. The…
November 24, 2026
PSA Singapore breaks ground on Tuas Port Phase Two to strengthen Global Trade Connectivity
PSA Singapore marked the groundbreaking of Tuas Port Phase Two, a significant step in the development of the world’s largest fully automated…
November 24, 2026
BIFA welcomes UK–EU trade progress and calls for clarity on implementation
The British International Freight Association (BIFA) has welcomed progress made at today's UK–EU Summit in Brussels, highlighting the potential…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved























…