Home Technical GTT receives its first order of 2021, from a SHI for the...

GTT receives its first order of 2021, from a SHI for the tank design of a new LNG Carrier


GTT has received an order from the Korean shipyard Samsung Heavy Industries (SHI) for the tank design of a new 174,000 m3 LNGC[1] on behalf of the Korean ship-owner Pan Ocean.

GTT will design the tank, which will be fitted with the Mark III Flex membrane containment system. The delivery of this vessel is scheduled for the second quarter of 2023.

This order is the first of the year for GTT. It follows a series of 29 LNG carriers orders received in the second half of 2020. GTT recalls that these orders, except for one, will be delivered over a longer period than usual, spreading over 2023 to 2025.

Previous articleABS AIP for DSME’s solid oxide fuel cell technology
Next articleTotal has successfully issued Hybrid Bonds to finance its development strategy in Renewables