LNG carrier ‘Tristar Ruby’ has arrived at the location of the terminal, as the first LNG carrier to arrive to the terminal, whereby the carrier was successfully moored in the special purpose port of the terminal. After all tests and safety checks were performed, LNG cargo transfer procedure from the LNG carrier on the FSRU vessel ‘LNG CROATIA’ has started. The procedure is expected to last until January 3, 2021, after which the tanker ‘Tristar Ruby’ will leave the terminal area and the special purpose port of the terminal. This activity marks the start of terminal commercial operation, in accordance with the planned deadlines.