On the 5th of September 2020, Our New Building supervision project of four (4) in no. Havila LNG Dual fuel Cruise Liners saw the launching of its first two Hulls no. NB1093 (HAVILA CAPELLA) and NB1094 (HAVILA CASTOR).
The launching activity was attended by Mr. Kjell Rabben as HAVILA Technical Director and Mr. Douglas Dalli as OSM Managing Director of New Building Site Supervision Teams.
The planned delivery date for the first two vessels, is expected to occur within the 1st quarter of 2021.
Information of ship & project:
The Milestone:
- Steel cutting was done on 29 Nov 2018
- Keel laying was done on 13 Feb 2019
- Launching was done on 5 Sept 2020
- Delivery will be on Q1 of 2021
Classification:
DNV GL: +1A – EO – CLEAN DESIGN – NAUT AW – COMF-C(2)-V(2) – BIS –PASSENGER SHIP – BATTERY POWER – GAS FUELLED
In addition the vessel to be built in according to the following: DNV GL: VIBR
Flag:
NOR
MAIN PARTICULAR’s:
- Length over all : approx. 124.10 m
- Length between perpendiculars : approx. 115.20 m
- Breadth, moulded : approx. 22.00 m
- Breadth extreme : approx. 28.00 m
- Depth to 3-Deck : approx. 8.20 m
- Depth to 4-Deck : approx. 11.30 m
- Scantling Draught : approx. 5.35 m
- Max. Draught : approx. 5.30 m
- Speed: 16 Knots at WL 4.65m
- Accommodation: 544 persons (468 passengers and 76 Crew)/ 468 passengers + 172 day passengers – 640 passengers in TOTAL
KYSTRUTEN is a modern Coastal Passenger Vessel that shall be able to operate year around along the Norwegian coast from Bergen to Kirkenes and Return according to the requirement given by the Norwegian Ministry of Transportation Samferdsels departementet.
The Kystruten vessel to be designed and constructed to provide safe, effective, comfortable, energy efficient and environmentally friendly transport, loading & unloading of Passengers and Cargo. The vessel shall be built according to safe return to port requirement and philosophy.
The basic principle for the design of this Vessel is to meet operational and environmental demands with the best and most modern solutions using LNG ( Liquid Natural Gas ) fuel and Battery power for the propulsion. In general special consideration shall be taken in the design, and in the selection of machinery and equipment etc, with regards to prevention of pollution and in order to obtain the highest possible energy efficiency of the vessel. The Vessel is designed with two azimuth propulsion thrusters aft and two tunnel bow thrusters fore, gives the vessel good operational capability.
The Vessel is Hybrid Gas-Electric / Battery driven for optimal operation and flexibility in order to reduce fuel consumption, emission, noise and vibration during transit and manoeuvring. The Batteries packages can be charged from a ashore power supply connection. The battery packages can also be used as an independent power source for possible “ZERO EMMISION” voyage, e.g. as in the UNESCO area of the Geiranger fjord.
New modern hull lines combined with optimal use of fin stabilizers will give the vessel good motion characteristics.
Related News.
October 19, 2026
OL Shipping Group in Tokyo: Capt. Eberhard Koch calls for realistic solutions to Maritime Decarbonisation
An intensive and engaging couple of days in Tokyo brought together leading figures from the international maritime community, providing a valuable…
October 19, 2026
Regatta for Peace one of the largest ever in Cyprus
Cyprus will host the first European stop on a global sailing journey leading up to the 2027 America’s Cup in Naples. More than 120 sailors…
October 19, 2026
The propulsion technology powering the marine energy transition
The marine industry is under increasing pressure to future-proof fleets, balancing the need to reduce emissions and improve efficiency. Propulsion…
October 19, 2026
Signal Ocean acquires Lgmar
Signal Ocean announced the acquisition of Lgmar, the Athens-based company behind Telix, a maritime email and communication platform in daily use…
October 19, 2026
Canada clean power push challenged by interprovincial grid limits, says GlobalData
Canada is entering a pivotal phase of power-sector expansion as federal tax credits, the phase-out of coal-fired generation, and accelerating…
October 19, 2026
Maritime safety depends on human factors and leadership, not procedures alone
Interim survey findings point to a gap between seafarers’ perceptions of risk and injury data Seafarers may misjudge when and where they are most at…
October 19, 2026
New BIMCO contracts tackle ship recycling and energy-saving retrofits
BIMCO adopted two new contractual solutions designed to help you manage important operational and regulatory challenges: the revised…
October 19, 2026
Stena Line to acquire vessel and make changes to its network
Stena Line has reached an agreement to acquire the RoRo vessel Somerset from CLdN. Subject to closure and transfer, the vessel would begin operating…
October 19, 2026
DORIC WEEKLY INSIGHT 16 OCTOBER 2026
Please find below the DORIC Market Insight for the week ending 16th October 2026. Weekly Report 16.10.2026
October 19, 2026
Important information for port clients and freight carriers effective November 1, a new traffic overpass and port checkpoint will open for traffic to the Port of Riga on Kundziņsala
Starting November 1 of this year, a new traffic overpass connecting Tvaika Street to Kundziņsala will open to facilitate traffic to and from the Port…
Subscribe to our newsletter!
if you dont want to swim alone in the ocean of news, sign up for the newsletter, and you will receive daily all the important news of world shipping!
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved
Design & Development by P.KAN.DESIGNER
© 2026 Cyprus Shipping News. All rights reserved